Government solution design · building permits

Keep every approval tied to the plans it approved.

A permit is granted against a specific set of drawings, on a specific day, by someone with the authority to grant it. Months later, in another system, an inspector has the permit but no way to prove which drawings it was for. Rootz keeps that link attached to the record.

Illustrative official record linked to its application, authority and supporting evidence.

The document version is part of the decision.

A permit workflow can involve revised drawings, land records, engineering reports and several departments. An approval is useful only when a recipient can establish which version and conditions it covers.

Rootz connects those exchanges to signed evidence. The municipality and its appointed reviewers retain the authority to assess and approve. This is a proposed integration design.

Follow one permit referral

  1. Register the submission

    Bind the applicant’s request to a versioned manifest of drawings and supporting documents.

  2. Check required evidence

    Record the source, age and completeness of the records required by the municipality. AI can assist with extraction and completeness checks.

  3. Refer the exact revision

    A signed instruction names the assessment, its scope and the document version the department must review.

  4. Return the assessment

    The reviewer signs the assessment under the appropriate authority. Binder connects the result to the referral and available process measurements.

  5. Authorize the permit

    The designated official or authorized process issues the permit with its conditions and references to the approved revision.

  6. Support inspections and amendments

    Inspectors verify the applicable record and status. A changed plan requires its own recorded review and authorization.

A focused first delivery

In the first workflowOwned by the wider program
Submission completeness and one departmental referralThe full permitting application and land-record systems
Version binding and signed assessmentEngineering judgment, planning policy and statutory approvals
Verifier integrated into the receiving applicationField devices, user training and citizen-service channels
Documented exceptions and evidence exportAppeals, amendments, retention schedules and operational support

Build on the digital services already taking shape.

Rwanda’s Building Permits Management Information System is a public example of permitting that spans submissions, reviews and inspections. It illustrates the breadth of the workflow; it is not presented here as a Rootz customer.

Our proposed contribution is the verifiable relationship among the request, the document revision, the reviewer’s authority and the returned decision.

Test a changed drawing, not just a successful approval.

The acceptance exercise includes a valid referral and a substituted plan revision. The recipient must detect the mismatch and follow the municipality’s exception process.

See the technical approach

Choose one department and one referral.

A small, well-defined exchange can establish the evidence pattern for the rest of the permitting service.

Plan the workshop